Part 2- Outdoor Zip -

Verify that tape application follows "shingle-lap" methods (top layers overlapping bottom layers) to shed water.

-inch gap at all panel edge joints to allow for proper movement.

) perpendicular to studs, staggering 4' vertical seams by at least 24". Leave a Part 2- Outdoor zip

Tape all panel joints and seams with ZIP System tape, ensuring the panel is dry and clean.

Use standard nails or screws, ensuring they are driven flush. Avoid overdriving (where the head is more than halfway through the panel), which can cause structural issues. Leave a Tape all panel joints and seams

Maintaining a rainscreen gap is recommended to prevent hydrostatic pressure, although not always required by code.

I can then provide specific tips on flashing or cladding attachment. Flashing a Window Using ZIP Tape Maintaining a rainscreen gap is recommended to prevent

Check for "fish-mouths" (wrinkles in the tape) that can allow water ingress. 5. Best Practices & Key Considerations