N_031.mp4 May 2026

These sensors transform hydraulic pressure into electrical signals to calculate load.

Below is a guide for the assembly and maintenance procedures typically associated with these technical standards. 🏗️ PAT/Hirschmann Crane System Guide n_031.mp4

Detailed wiring diagrams and flowcharts can be found in the PAT DS350 Service Manual or via WIKA Mobile Control Support . LENGTH-ANGLE-RADIUS-LOAD INDICATING SYSTEM n_031.mp4

: Set the boom between 0 and 5 degrees. Use an inclinometer to verify the actual physical angle. n_031.mp4

: Test that the system successfully disables crane functions during an overload condition.

: If replacing the system chip, ensure the notch faces the correct direction to avoid frying the board.

: Lower the boom completely to remove rest pressure. Disconnect hydraulic hoses.